Professional Customized Modular Mezzanines System For Civil Use To Australian Standard

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Shandong
Validity to: Long-term effective
Last update: 2017-11-14 17:00
Browse the number: 351
inquiry
Company Profile
 
 
Product details


Key advantage:

 

1)Top client: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil etc.

2)90% exported to 40 countries like Germany, America, Slovakia,Saudi Arabia, South Africa, Oman etc.Total weight 400,000tons.

3)Certificate:

ISO9000, ISO14000, ISO18000 by BV France        

EN-1090 CE certificate

American CWI

European TWI

European IWE

 

1.The other information of our product:

Material standard: Q235B/ Q345B, SS400, ASTM 5273

Delivery date: 30-45days after received the payment in advance.

Price Term: FOB QINGDAO PORT

Payment Term: T/T or L/C(30% down payment,balance is paid beforeshipment )

Packing Term: In Bulk, Load in one 20ft/40ft/40ot container.

 

2.Wall Girts is also belonged to our supply scope.

The wall girts are cold formed Z shape members, which are of various thickness and variable depth depend upon the design. The wall girts are connected to the external extension of the columns along the walls. Clips already made along the columns join the wall girts to the outer projection of the side wall lines, the network of wall girts being joined to the clips. The wall girts are vital to the secondary framing systems, which along with the primary framing systems and the connectible sheeting form the pre-engineered structure.

 

3.Our BIM Capabilities:

Tekla has been at the forefront of Building Information Modelling (BIM) development and a leading advocate since its inception in the early two thousands. We uses the latest versions of Tekla Structures to carry our all detailing work and we are therefore able to offer detail rich BIM models with all attributes intact that meet all required BIM standards.

 

4.Health, Safety & the Environment

Health & Safety

We engage Third party Health and Safety Consultants to prepare and implement a Safety Management Control System specifically tailored to our needs covering both off and on site activities.

They also undertakes regular risk assessments and safety audits and we have access to their 24 hour Health and Safety advice line.

 

5.We work to establish close working relationships and as a result enjoy a high proportion of repeat business.

Our team are experts in providing the following detailing services:

- Quality edited GA's and marking plans for submission and installation

- 3D erection drawings / Phasing Drawings

- Preliminary Material Lists

- Fabrication and prep drawings

- Material cutting lists and bolt lists

- Digital date for manufacture (NC’S, DXF’S IFC’S)

- Holding down bolt layouts

- Cold rolled detailing

 

6.Project case:

Project name:Ceramic Tile Factory

Location:Pakistan

Area:49050m2

Project time:the year of 2015

This workshop is used for ceramic tile production,all use steel frame with an area of 49050m2.Main materials are as following:

Steel truss:Q345B

Column:Q345B

Roof&wall purlin:galvanized Z280X75X20X2.5

Horizontal bracing: 25 round steel

Wall cladding:corrugated steel sheet+glass wool+corrugated steel sheet

Roof cladding:corrugated steel sheet+glass wool,skylight panel,ventilator

Door:electric rolling door,electric sliding door

If you are interested,feel free tocontact us directly!

 

7. We have been involved in“modular mezzanines”supply for many years.

It has different names like below:

modular mezzanine

modular mezzanine system

we have very good reputation in this field all over the world.


Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]